It has been over a month since we have last posted a house update. There has been quite a lot of progress. The exterior color of stucco has been applied, the roof tiles are installed, the driveway and walkway has been poured. The doors have been installed throughout the house, as well as the exterior doors and their hardware. Also, we are now locked out as more interior work is going on. The cabinets have all been installed and the tiles have been laid in the bathrooms. Also, we have selected the granite for our counters and expect to see them installed in the next week or so. Take a look at the house progress page for more photos.